Building And Structural Surveying N5 — Document

April 2018 — N5 — Building And Structural Surveying

N5 2018 Nated Engineering
↓ Download PDF Facebook X 📄 498.8 KB
Preparing document

📋 Document Analysis

🎯 100 marks ⏱️ 3h 📄 4 pages 📝 27 items found
See full analysis

Questions — A Preview of What to Expect in the Document

27
This section provides a quick preview of questions from the document. It may not display every question or the complete wording of each one. For the full content, including diagrams, tables and other information, view the original PDF above.
Q1— Section header —
1.1hen levelling is done n intermediate site falls between (back and fore sight/rise and fall/mean sea level and benchmark\.
1.2Dips are done to identify whether a fill has reached the required (level/density/porosity\
1.3Pegs for benchmarks are usually made of (steel/wood/plastic\
1.4Topsoil is removed to a depth of about (150 mm/20 mm/75 mm\
1.510
Q2— Section header —
2.1A traveller is mainly used to take measurements along the road construction
2.2A theodolite can be used to set out vertical and horizontal angles
2.3Cross errors and systematic errors are classified as the two most common errors when reading a staff
2.4One of the basic requirements when setting up a levelling instrument is to adjust the circular bubble to be in its centre
2.510
Q3— Section header —
3.1Change point
3.2Intermediate sight
3.3Fore sight
3.4Back sight
3.5
Q4— Section header —
4.1Explain the relationship between co ordinates and direction
4.2Name FOUR mistakes that may occur in surveying (4\
4.3A plot has the shape of a trapezium The long side is 74 m and t he short side is 39 m The perpendicular distance between the two sides is 24 m
4.4A length of 120 m was measured horizontally in catenary, and the measurement was done in three equal bays. The mass of the tape is 0,015 kg/m and the tension applied is 7 kgF. Calculate the correct length.
Q5— Section header —
5.1Calculate the total length of the pipework from C1 to C7. (25\
5.2Name any FIVE tools used during step chaining. (5\ [30]30
Q6— Section header —

Mark Allocation

Total100 marks
Sections10 + 10 + 20 + 30 + 15 = 85 marks

Paper information

TitleDocument
SubjectBuilding And Structural Surveying
LevelN5
Document typeQuestion paper
Year2018
MonthApril
Pages7
Downloads4

Examination context

Decade2010s
Years ago8y
SeasonAutumn (SH)
Start daySunday
Exam periodApril 2018
Days since exam3,115

About Building And Structural Surveying examination preparation

This TVET examination resource can be used as part of a structured revision programme. Past papers are most useful when learners attempt questions independently, work within a realistic time limit, and review their answers afterwards.

How to use this resource for revision

A TVET past examination paper is most useful when it is treated as an active revision exercise. Try the questions yourself before checking the corresponding memorandum. Where you make an error, identify the reason — was it a knowledge gap, a calculation mistake, an interpretation issue, or an examination technique problem?

For stronger examination practice, complete the paper without unnecessary interruptions and keep track of the questions that take the most time. Afterwards, review the memorandum and separate knowledge gaps from mistakes caused by interpretation, calculation, structure, or examination technique.

understanding question requirements
applying subject knowledge
working under time constraints
checking answers
identifying revision priorities

A practical revision approach

Start by completing the resource without looking at the memorandum. Review incorrect and incomplete answers afterwards and make a short revision list based on the areas that caused difficulty.

File details

File size498.8 KB
Pages7
Archived on8 September 2026
File age46d
ContributorFreeMode
Fingerprint9B311589D46A

Questions and learner discussion

Log in to ask a question or leave a review.

No questions or discussions have been posted yet.