Building And Structural Surveying N4 — Document

December 2023 — N4 — Building And Structural Surveying

N4 2023 Nated Engineering
↓ Download PDF Facebook X 📄 496.7 KB
Preparing document

📋 Document Analysis

🎯 100 marks ⏱️ 3h 📄 5 pages 📝 43 items found
See full analysis

Questions — A Preview of What to Expect in the Document

43
This section provides a quick preview of questions from the document. It may not display every question or the complete wording of each one. For the full content, including diagrams, tables and other information, view the original PDF above.
Q1— Section header —
1.1Trilateration
1.2Military surveying
1.3Level line
1.4Systematic errors
1.5Parallax (5 3\ [15]15
Q2— Section header —
2.1A length of 250 m was measured with a steel tape at an altitude of 1 700 m below sea level. The radius of the earth is 6 575 km. Calculate the horizontal distance (3\
2.2
2.3from horizontal. Calculate the correct horizontal distance between two points. (3\
2.4State FIVE disadvantages of chain measurement (5\ [15]15
Q3— Section header —
3.1What are ranging rods (2\
3.2FIGURE 2, DIAGRAM SHEET 1 (attached\shows an Abney level Label the part by writing the answer net to the question number (3.2.1
3.2.8\in the ANSWER BOOK. (8\ [10]10
Q4— Section header —
4.1A trigonometrical beacon is 1,25 km from where you are standing. How far from the beacon would you be on the map if the scale was 1:20 000? Provide the answer in mm. (4\
4.2Draw the South African co ordinate system showing Y and X axis and also where it increases and decreases in all four quadrants.
Q5— Section header —
5.1Convert the following whole circle bearings (WCB\ to quadrant bearing (QB\
5.1.130
5.1.2140
5.1.3240 (3 2\ (6\
5.2Convert the following quadrant bearing (QB\to whole circle bearings (WCB\
5.2.1N 30
5.2.210
Q6— Section header —
6.1Prism
6.2Mirror
6.3A dumping device
6.4The graduation ring
6.510
Q7— Section header —
7.1triangular piece of land has sides of 200 m, 130 m and 100 m. Calculate the area of the land in hectares. (5\
7.2FIGURE 1 below shows a piece of land. The off sets from the survey line to the boundary line is indicated in the sketch. The distance between the off sets is 4,5 m. Calculate the area between the survey line and volume, using the
Q8— Section header —
8.1Define plane table surveying (2\
8.2State SIX disadvantages of using plane table surveying. (6\
8.3State five important general instructions when working with a plane table. (3\ [10]10
Q9— Section header —
9.1State SIX uses of levelling in surveying. (6\
9.2State FOUR natural causes of errors in levelling. (4\ [10] TOTAL: 100 (80600 4\ Copyright reserved10
3.2.6

Mark Allocation

Total100 marks
Sections15 + 15 + 10 + 10 + 10 + 10 + 10 + 10 + 10 = 100 marks

Paper information

TitleDocument
SubjectBuilding And Structural Surveying
LevelN4
Document typeQuestion paper
Year2023
MonthDecember
Pages7
Downloads5

Examination context

Decade2020s
Years ago3y
SeasonSummer (SH)
Start dayFriday
Exam periodDecember 2023
Days since exam1,044

About Building And Structural Surveying examination preparation

This TVET examination resource can be used as part of a structured revision programme. Past papers are most useful when learners attempt questions independently, work within a realistic time limit, and review their answers afterwards.

How to use this resource for revision

A TVET past examination paper is most useful when it is treated as an active revision exercise. Try the questions yourself before checking the corresponding memorandum. Where you make an error, identify the reason — was it a knowledge gap, a calculation mistake, an interpretation issue, or an examination technique problem?

For stronger examination practice, complete the paper without unnecessary interruptions and keep track of the questions that take the most time. Afterwards, review the memorandum and separate knowledge gaps from mistakes caused by interpretation, calculation, structure, or examination technique.

understanding question requirements
applying subject knowledge
working under time constraints
checking answers
identifying revision priorities

A practical revision approach

Start by completing the resource without looking at the memorandum. Review incorrect and incomplete answers afterwards and make a short revision list based on the areas that caused difficulty.

File details

File size496.7 KB
Pages7
Archived on8 September 2026
File age46d
ContributorFreeMode
Fingerprint088C0AFC8BDE

Questions and learner discussion

Log in to ask a question or leave a review.

No questions or discussions have been posted yet.